ECOTIRES® RUBBERIZED SILICONE

Engineered for
Permanence

Stop cycling through short-lived roof patches. Our vulcanized rubber-silicone hybrid molecularly bonds to commercial substrates—forming a monolithic, UV-impervious armor that delivers complete structural restoration without tear-off downtime.

Zero roof tear-off · Commercial warranty backed · Engineered longevity

MATERIAL ARCHITECTURE

Strength in
Materials

Engineered from diverted tire polymers and high-solids siloxanes, our hybrid coating establishes a monolithic, cross-linked barrier calibrated for extreme commercial duty.

Recycled Rubber Durability

Cold-milled tire vulcanite infuses extreme tensile elasticity (300% elongation), absorbing structural movement and heavy rooftop hail without fracturing.

100% Silicone Waterproofing

High-solids polydimethylsiloxane cures into an inorganic, non-porous skin impervious to permanent ponding water, chemical runoff, and biological deterioration.

Advanced Thermal Protection

Reduce heat transfer and improve thermal comfort.

In a private test conducted on a metal building, temperatures dropped by 15°F after application, demonstrating the coating's potential to reduce heat buildup.

COATING SCIENCE BENCHMARK

Defy the
Elements

Rigid acrylic films crack under thermal shock and dissolve in standing pond water. ECOTIRES® vulcanized rubberized silicone forms an elastomeric, molecular bond engineered for permanent elemental resistance.

ECOTIRES® Shield Technology
ASTM C1549 SOLAR REFLECTANCE BENCHMARK
Scorching Heat & Continuous UV Exposure
Acrylic coatings dry out, embrittle, and hairline-fracture under thermal shock. ECOTIRES® vulcanized rubber retains 450% elongation with zero chalking or chalk degradation.
Traditional Acrylic
Rigid / 85°C Surface Temp
ECOTIRES® Shield
Elastomeric / 38°C Surface Temp
Verified Weather Resilience Laboratory Tested ASTM Protocols

FAILURE MECHANISM VS. ENGINEERED MATRIX

Why Traditional Acrylics Inevitably Fail

Acrylic coatings rely on water evaporation to cure, leaving behind a brittle polymer chain vulnerable to ponding moisture. Under repeated solar expansion cycles, acrylic tears at expansion joints and loses adhesion at roof penetrations.

  • Acrylic Brittleness: Cures rigid, losing elasticity within 18 months under harsh UV radiation.
  • Moisture Sensitivity: Standing ponding water re-emulsifies acrylic resins, causing extensive blistering.
  • ECOTIRES® Flexibility: High-tensile recycled tire matrix expands and contracts without micro-cracking.
  • Permanent Hydrophobia: Zero moisture absorption even under standing pond conditions up to 365 continuous days.

Industrial ASTM C1549 & D471 tested • Proven ponding resistance

APPLICATION PROTOCOL

Three Steps to
Restoration

Tearing off an aging commercial roof costs up to three times more, disrupts business operations for weeks, and dumps thousands of pounds of viable insulation into landfills. Our fluid-applied elastomeric process restores watertight integrity in place, turning your existing substrate into a sustainable asset.

Layered Performance Cross-Section
Top Coat: High-Solids Silicone

UV barrier, seamless puddle-proof seal

Waterproof
Core Matrix: Recycled Rubber Grain

Thermal absorption & impact resilience

Elastic Core
Substrate: Existing Commercial Deck

Cleaned, primed & mechanically locked

Restored Base

STAGE 01

Clean: Deep Decontamination

Industrial high-pressure hydro-wash eradicates oil residues, algae, accumulated oxidation, and loose particulate. Infrared thermography scans confirm zero trapped moisture inside substrate insulation before work proceeds.

STAGE 02

Prep: Structural Stabilization

All seams, parapet flashings, penetrations, and fasteners receive mechanical torque checks and flexible mastic reinforcement tape. A high-adhesion bonding primer locks onto the cleaned membrane to create an unyielding foundation.

STAGE 03

Protect: Dual Elastomeric Armor

Airless spray rigs apply the dual-pass elastomeric tire-rubber core followed by a commercial silicone topcoat. This forms a single monolithic membrane that repels severe ponding water, deflects 88% of solar heat, and expands up to 300%.

Zero facility closure required. Work carries a transferable 15-year warranty.

FACILITY SCOPE & INVESTMENT

Invest in
Longevity

Restore your commercial envelope at a fraction of capital replacement cost. Engineered maintenance programs preserve assets, eliminate tear-off waste, and qualify as 100% operational expenses.

UP TO 50,000 SQ. FT. • MID-SIZE WAREHOUSES

Standard Commercial

Targeted restorative coating for regional distribution centers, light manufacturing hubs, and commercial facilities battling seam failure or thermal deterioration.

ROI Advantage: Saves up to $4.50 / sq. ft. versus full roof tear-off and replacement while eliminating operational disruption.

  • Complete mechanical seam, fastener, and penetration sealing

  • High-solids elastomeric recycled rubber base application

  • UV-reflective silicone finish delivering up to 88% solar reflectance

  • 20-Year Renewable Waterproofing & Leak-Free Performance Warranty

  • 100% operational continuity: zero business downtime or interior disruption

Average investment recovery: Under 36 months via energy efficiency and deferred capex.

50,000+ SQ. FT. • LOGISTICS & INDUSTRIAL CAMPUSES

Industrial Scale

Turnkey enterprise restoration programs for massive flat roofs, multi-building industrial parks, and heavy logistics facilities demanding multi-decade asset protection.

ROI Advantage: Saves up to $7.20 / sq. ft. vs complete re-roofing, with 100% first-year tax expensing under Section 179 maintenance provisions.

  • Infrared thermal moisture scan & structural membrane mapping
  • High-tensile perimeter reinforcement & heavy ponding resistance build-up
  • Multi-ply composite barrier diverting over 4,000+ tires from landfills
  • 15-Year Transferable Industrial Performance & Ponding Water Warranty
  • Dedicated project engineering oversight and continuous lifecycle testing

Average investment recovery: Under 24 months with direct accelerated tax write-offs.

FIELD-VERIFIED PERFORMANCE

Trusted by
Industry

Commercial facility managers and industrial roofing contractors validate continuous weatherproofing across millions of square feet during severe weather anomalies.

★ ★ ★ ★ ★

During prolonged Category 3 windstorms and torrential downpours, our 450,000 sq. ft. distribution warehouse experienced zero seam breaches. Restoring rather than replacing saved our capital budget $340,000 while maintaining seamless operational continuity.

Marcus Vance
Marcus Vance
Director of Facilities, Apex Logistics Hub
★ ★ ★ ★ ★

We coated our 14-acre retail center roof right before an aggressive hail season. While neighboring properties experienced significant membrane punctures and ponding water leaks, our coating sustained direct impact without a single penetration.

Elena Rostova
Elena Rostova
VP of Asset Management, NorthPoint Commercial Center
★ ★ ★ ★ ★

The rapid cold-application cure enabled our crew to encapsulate four industrial warehouse rooftops ahead of an impending winter freeze. Three severe freeze-thaw cycles later, the monolithic rubber elasticity remains entirely intact.

David Kallen
David Kallen
Senior Project Contractor, Summit Industrial Parks

FINAL INSPECTION WINDOW

Protect Your
Facility

High-wind and freeze-thaw cycles compromise untreated commercial roofing substrates. Secure your engineered assessment and ASTM-compliant sample kit before seasonal backlogs close regional availability.

Free ASTM Physical Sample Kit Included : Guaranteed 48-Hour Response : Zero Facility Downtime

LIVE ENVIRONMENTAL METRIC

2,480,000+

Tires Diverted from Landfills

Engineered into industrial-grade silicone elastomeric roof coatings across 12M+ sq. ft. of active commercial roofs.